Production lead time varies according to the model, order quantity and customization scope. A standard configuration generally requires less engineering work, while a custom cabinet, new delivery mechanism, special temperature range, branded interface or payment integration may require additional design, sourcing, prototype and testing stages.
A project schedule can be confirmed after the technical requirements, artwork, payment configuration and order details are approved. The schedule should include engineering confirmation, material preparation, assembly, software configuration, quality inspection and packing. Please also allow separate time for international transportation and destination customs clearance.