A vending machine acceptance test matrix prevents a long demonstration from missing an important requirement. Give each agreed requirement an identifier and connect it to a specific verification method. “Machine works” is too broad to close payment, package fit and reporting separately.
For vending purchase requirement verification, record the requirement reference, setup, expected result, observed result and evidence. Add the machine and configuration revision. A requirement verified by a drawing should be distinguished from one requiring a physical purchase test.
Vending factory site test responsibility should identify what can be completed before dispatch and what depends on final installation. Site network access, lighting and delivery route cannot be fully accepted from a factory video.
Keep unresolved items in the acceptance punch list. Agree the matrix with WEIMI before the test date so the evidence needed for release is available.