A promising location needs more than foot traffic. The machine must reach the position, operate within its specified conditions and remain practical to service. A site survey turns those questions into recorded facts that the buyer, property team, supplier and installer can review together.
Survey the exact proposed position rather than the building in general. A reception area may have good mobile reception while a recessed corridor does not. An electrical outlet nearby may belong to a circuit that cannot support the proposed equipment.
Record opening hours, the people who use the space and the products they are likely to need. Note nearby shops, staff catering and other alternatives. Count relevant traffic over representative periods if possible, and distinguish visitors who pass the machine from those who can stop and purchase.
Ask about closures, seasonal changes and planned building work. A busy observation during one event is not a reliable annual demand estimate. Keep the evidence separate from assumptions in the business case.
Record the full unloading and internal route, including door openings, turns, lifts and any restrictions on vehicle access. Use the exact machine's transported dimensions and weight. Obtain the mover's assessment for difficult routes rather than assuming the cabinet can be tilted or partly dismantled.
At the final position, allow for door swing, replenishment, ventilation and servicing. Identify which parts need access from the rear or side. Check that customers using the machine will not block an exit, doorway or required circulation space.
Give the site electrician the manufacturer's electrical requirements for the selected configuration. Confirm supply voltage, frequency, connection type and any circuit or protective-device requirements. Do not infer compatibility from a similar-looking plug or another machine operating nearby.
Agree who installs or upgrades the supply and when it will be ready. Avoid planning around improvised adapters or extension leads. The installer should verify the connection under the relevant local requirements before the equipment is energised.
Measure or establish the expected ambient conditions, including seasonal extremes where relevant. Direct sun, rain exposure, humidity, dust and restricted airflow can affect suitability. An indoor machine placed under a small canopy does not automatically become suitable for outdoor use.
Confirm the manufacturer's operating range and installation clearances in writing. For refrigerated products, consider how heat from surrounding equipment and frequent service-door openings may affect recovery. If the position cannot meet the requirements, change the position or the equipment specification before ordering.
Check the actual communication method intended for the terminal and management system. Building Wi-Fi may require authentication that an unattended device cannot use, and mobile coverage varies by network and antenna arrangement. A phone test is only a preliminary indication.
Agree network ownership, permitted connectivity and the support contact. Ask how the selected system behaves when communication is lost. Do not assume that payment, sales reporting and remote management all share the same connection or offline behaviour.
Record service access hours, parking, loading restrictions and the route from stock storage to the machine. Confirm waste handling, cleaning arrangements and who responds to a leak, outage or failed payment. Include a clear machine identifier and customer contact method in the installation plan.
For food, verify the relevant storage, handling and monitoring procedures. For any regulated product, assess the applicable requirements separately. A general site survey does not replace the approvals required for the particular goods and location.
Keep a short action list with an owner and completion date for each item. Examples include a supply upgrade, a lift booking, written landlord approval or confirmation of a payment provider. Photograph the approved position and retain the agreed layout.
Send the completed survey with your equipment enquiry. Combine it with the delivery route measurements and a realistic service plan. Resolving these details before dispatch reduces the chance of a machine arriving at a site that is not ready to operate.