WEIMI INSIGHTS / DELIVERY PLANNING
Separate the factory-to-port journey from the work needed to get a heavy machine into its final operating position.
FREIGHT
The transport legs included in the quote.
HANDLING
Unloading equipment and site access.
PLACEMENT
The final move to the operating position.
Compare shipping proposals using the same named destination and handling scope, with responsibility for each step written down.
01 / BUYER NOTES
A freight quote may end at a port, a warehouse, the kerb outside a building or a specified unloading point. These are materially different services. Provide the delivery address and ask the supplier to state exactly where its responsibility ends.
Where trade terms are used, confirm the named place and applicable version with the parties handling the shipment. Do not infer unloading, customs clearance or installation from a short term alone. Have the logistics provider explain the practical responsibilities for your particular route.
02 / BUYER NOTES
Transport planning needs the packed size, gross weight and handling instructions for the final configuration. An accessory cabinet or export crate can change the shipment significantly. Confirm whether the quoted figures are preliminary and when final packing details will be available.
Ask the receiving team what equipment it needs to unload safely. A loading dock, forklift or suitable delivery vehicle may be required depending on the load and site. The equipment selection and lifting plan should be handled by competent personnel using the actual shipment information.
03 / BUYER NOTES
Check doors, corridors, lifts, thresholds and turns between the unloading point and the installation position. Include crate removal and the space required to manoeuvre. A machine that fits through the main entrance may still be unable to turn into the intended room.
Agree who performs this final move and who prepares the site. Inside delivery and positioning may be separate from freight. Confirm the treatment of waiting time, failed access, storage and redelivery so an avoidable site problem does not become a surprise charge.
04 / BUYER NOTES
Arrange a receiving contact who can inspect the shipment and document visible damage under the agreed delivery procedure. Keep the packing information and transport references available. Clarify how exceptions should be reported and what evidence the carrier or insurer requires.
Do not assume the installation team can attend at the same moment as an uncertain freight arrival. Build a handover plan that covers secure temporary storage, unpacking, positioning and commissioning. Follow the manufacturer’s instructions before powering up equipment after transport.
Specify: Origin, route, named destination and included transport legs.
Confirm: Which destination, clearance or local charges remain outside the price.
Specify: Packed dimensions, weight, unloading point and access constraints.
Confirm: Equipment, crew, inside delivery and crate disposal.
Specify: Receiving hours, appointment requirements and inspection process.
Confirm: Waiting, storage, redelivery and damage-reporting responsibilities.
PRACTICAL ANSWERS
Not necessarily. Ask for the delivery endpoint and handling scope in writing, even when the transport charge is bundled into the equipment price.
Use final packed dimensions and gross weight for freight planning. Unpacked dimensions are also needed for the internal route, but serve a different purpose.
That depends on the contract and cause. Clarify access responsibilities and failed-delivery charges before booking rather than resolving them after arrival.
YOUR NEXT STEP
Share the destination, access route and required handling services with the equipment enquiry. A clear logistics brief makes quotations easier to compare and reduces gaps between transport and installation.
Explore equipment →Discuss your requirements →