A cabinet can fit neatly against a wall while blocking access needed for service or restocking. Ask for the manufacturer’s clearance and door-opening requirements and place them on the site plan.
Walk through a refill with the host: opening the cabinet, setting down stock and keeping the surrounding route usable. Have the responsible building team assess access and applicable local requirements.
If the layout conflicts with a door, panel or maintenance route, move the proposed position and repeat the review. Do not assume that a rarely used door can remain obstructed.
Retain the approved layout for installers. Moving the fridge a short distance on delivery day may change the agreed access or electrical arrangement.
For equipment enquiries, review the WEIMI equipment range and send the supplier the project requirements described here.
Planning reference: the SBA business-planning guidance explains customer research and cost planning. The checks above are practical procurement suggestions, not a forecast of sales or a claim of equipment capability.
Related operating question: Smart Fridge Door Swing Meets a Queue Barrier: How to Review the Layout.