A renovated floor may look finished before the space is ready for equipment delivery. Agree a site-readiness check with the building team and installer.
Confirm access, completed works and any floor-protection or curing restrictions with the responsible contractor. Ask the equipment installer what conditions must be met before placement and connection. Do not use a general waiting period in place of the material supplier’s and contractor’s instructions.
Record who signs off the site and who can change the delivery date. Include cleaning, dust-producing work and remaining trades in the discussion. Protect the machine from being used as temporary storage during the final fit-out.
Ask how aborted delivery, storage and a return visit would be charged. A clear readiness decision gives the buyer a chance to reschedule before the vehicle arrives.