The lift door opening is only one part of a smart fridge delivery check. The cabin, approach, load limit and handling equipment also matter.
Obtain the shipping weight and dimensions for the ordered configuration, including packaging. Give them to the building manager and delivery contractor. Ask the contractor to assess the combined load and maneuvering requirements under the building’s rules; avoid doing a safety-critical lift calculation from a catalogue weight alone.
Confirm which lift is booked, who controls it and what happens if it is unavailable. Keep the approved route and contact details with the delivery instruction. If unpacking is proposed before the lift journey, obtain written handling guidance and a suitable agreed location.
The result should be an accepted delivery plan with named responsibilities. It should not rely on the driver discovering the building restrictions on arrival.