Prepare route measurements, unloading evidence, handoff roles and site acceptance.
A final floor position can be large enough while a gate, loading area, door, corridor, lift or turn creates the real constraint. The complete route should be measured and approved before shipping and placement are discussed.
The buyer, logistics provider, site representative and equipment supplier may own different parts of the move. Record responsibilities and restrictions rather than assuming a standard delivery service.
Record booking requirements, vehicle limits, loading hours and site contact.
Identify permitted unloading point, surface, weather exposure and responsibility.
Capture gates, doors, corridors, turns, ramps, steps and lifts.
Document coverings, permits, security and work-area controls.
Check footprint, clearance, door movement and service access.
Document confirmed information and approvals without assuming compatibility.
Record condition, location, open issues, owner and next action.
| Route zone | Record | Evidence | Owner |
|---|---|---|---|
| Arrival | Access hours and vehicle rules | Site note | Property contact |
| Unloading | Area, surface and restrictions | Labelled photo | Logistics lead |
| Internal route | Narrowest width, height, turns | Route sketch | Site lead |
| Final position | Footprint and clearance | Dimensions | Project owner |
The transport plan and the prepared location must meet at a documented handoff. Any unknown handling, access or utility condition should remain an open action.
Only the final area was measured.
Door opening and refill clearance were not checked.
Delivery exceptions have no named decision maker.
No. Review the entire route, including turns, lifts, thresholds and handling restrictions.
The relevant buyer, site and logistics stakeholders should confirm their responsibilities.
Provide route dimensions, site rules, final placement evidence, product scope, quantity and target schedule.
Share the real packaged products, site evidence and operating requirements with WEIMI. The team can review the inputs and discuss a configuration path. Custom requirements remain subject to feasibility confirmation.
Useful starting package: representative packs, target sites, project quantity, payment preference, branding needs and delivery constraints.