A compact snack vending site survey starts with the exact cabinet being quoted. The word “compact” does not establish that a machine will pass through an office door, fit a lift or leave enough room for refilling. A useful purchase brief separates the catalogue dimensions from the delivery envelope and the space required during operation.
The manufacturer's WM0-WJ1 listing states W870 mm × D887 mm × H1910 mm and a weight of 150 kg. It also lists a 10-inch screen, 3–20°C cooling and elevator/infrared drop sensor as optional features. These are specifications attributed to this listing, rather than measurements from a completed customer installation.
Keep the model number next to the dimensions in the survey. A WM0-WJ1 reference does not establish the dimensions or weight of every WM0 cabinet. The page does not identify whether 150 kg is a net, packed or loaded weight, so the quotation needs to clarify the weight basis before a delivery plan is approved.
Record the clear opening at each doorway, the lift doorway and cabin, changes of level, thresholds and the turns along the intended route. Include photographs showing where each measurement was taken. A door measurement alone does not show whether a tall cabinet can turn into the room.
Compare those records with the supplier's packed dimensions and proposed handling method. The published cabinet dimensions are not a shipping envelope. Ask whether packaging, a pallet or handling equipment changes the required space. The listing's description of the machine as easy to move does not supply a handling plan or confirm that a particular lift or floor is suitable.
Mark the proposed cabinet position, then request a drawing that shows door opening, refilling access, collection access and service points for the quoted configuration. Record nearby walls, furniture and the route used by staff carrying replacement stock. A cabinet outline on a floor plan cannot show all of these working positions.
The listing does not provide numeric ventilation or service clearances. Ask the supplier to specify them rather than selecting a generic gap. Cooling at 3–20°C is a listed internal operating range; it does not establish suitable room temperatures or an outdoor installation rating. For more detail, use the delivery-sensor configuration review when an optional sensor is included in the quote.
Attach the intended pack dimensions and product list to the compact snack vending project checklist. The catalogue's 270–540 capacity range does not confirm how many of those exact packs will fit. Ask for the proposed tray layout and usable allocation before deciding that the planned snack machine location can support the intended refill routine.
Keep electrical supply, connection position and host access arrangements as open questions until the quotation and site review resolve them. This source does not establish a power rating, an approved circuit arrangement or permission to install at a particular venue. Review the compact snack machine refill workflow alongside the site drawing so that stock movement is considered before approval.
Send WEIMI the destination, model reference, annotated route measurements, proposed cabinet position, working-space questions and snack pack list. Ask for a written response identifying the final dimensions, weight basis, handling responsibilities and unresolved site checks. Get My Custom Quote with those records so the next discussion concerns the actual configuration and location.